The following report on the Aeration Facility Project is for your information. This report will be transmitted whenever changes occur to the operation of the aeration facility, and as a result of data monitoring of dissolved oxygen in the Stockton Deep Water Ship Channel.
With dissolved oxygen levels approaching 5.0 mg/l, the Aeration Facility may be operated the week of June 2nd. Due to an electronic component failing in Pump A, the facility will be operated at only 50% capacity. Pump A should be back in operation the week of June 9th once the contractor makes the necessary repairs.