The following report on the Aeration Facility Project is for your information. This report will be transmitted whenever changes occur to the operation of the aeration facility, and as a result of data monitoring of dissolved oxygen in the Stockton Deep Water Ship Channel.
As a part of ongoing pulse tests, the Aeration Facility was turned on Tuesday, August 26, 2008 at about 11:00 a.m. and will run for 7 days. The system is being operated with oxygenated water with a dissolved oxygen (DO) level in the middle 30 mg/l range. The Aeration Facility will be turned off on Tuesday, September 2, 2008 at about 11:00 a.m. The system will then be off for 7 days and turned back on Tuesday, September 9, 2008.