The following report on the Aeration Facility Project is for your information.  This report will be transmitted whenever changes occur to the operation of the aeration facility, and as a result of data monitoring of dissolved oxygen in the Stockton Deep Water Ship Channel.


Aeration Facility Weekly Update for September 2, 2008

A change has been made to the operation schedule for the Aeration Facility. Rather than shutting down today, the system will operate through Friday, September 5, 2008 at about 11:00 a.m. This will allow us to analyze a 10-day operation cycle. A longitudinal survey will be made after the system is turned off. The system will then be off for 10 days and turned back on Monday, September 15, 2008.