The following report on the Temporary Barriers Project is for your information and action, as appropriate.  This report will be transmitted whenever changes occur to the operation of the barriers, and as a result of modeling and/or field monitoring of water levels in the south Delta.


STATUS AS OF:   September 25, 2015

Head of Old River (HOR) Barrier:

As a result of low flows in the San Joaquin River, the California Department of Fish and Wildlife has requested DWR install the Fall Head of Old River Barrier to maximize the effects of the attraction flows to support the returning adult salmonids into the tributaries and their respective spawning habitats.  Construction of barrier started on Thursday September 3, 2015 with closure on September 14, 2015 and completion of the construction by placement of the chain-link fence around the barrier was achieved on September 17, 2015.

Agricultural Barriers (Middle River [MR], Old River near Tracy [ORT], Grant Line Canal [GLC]):

The Middle River and Old River near Tracy barriers were notched on Thursday September 08, 2015 to allow passage for migratory fish.  The Grant Line Canal Barrier flash board structure is set in the wide open position.
   
The Emergency Drought Barrier [EDB]:

Removal of the Emergency Drought Barrier started on September 8, 2015, breaching is scheduled for October 1, 2015 with a complete removal target date of November 15, 2015.

Environmental Permits Compliance Reporting:

Environmental staff has conducted pre-construction surveys as required by State and Federal permits and Biological Opinions.  An Environmental Tailgate Session was held at the Head of Old River Barrier site to inform construction staff of the permit requirements, to give a general overview of sensitive species found at or near the construction site and to instruct personnel on proper procedures to follow when sensitive species are encountered on the construction site.  Additionally, an Environmental Compliance Monitor was on-site for all construction work.  A water quality monitoring and sampling for settleable solids and turbidity were conducted during the installation of the barrier and DWR will continue water quality monitoring during the operation of the barrier period. 

 

Water Levels and Water Quality Notifications:

DWR will continue to monitor the water quality and water levels during the operation of the fall head of Old River barrier and at all agricultural barriers sites.

Modeling:

Thanks to Reza of the Delta Compliance and Modeling Section for performing this week modeling run; the modeling period spanned from 9/16/2015 through 10/12/15.  Forecasted water levels are well above the specified threshold in Middle River, Old River near Tracy and in Doughty Cut. The drought barrier was taken into consideration and it was part of the modeling assumptions.  A copy of the modeling results is attached.


Real-time south Delta water level data is available on CDEC at the URL below:
http://cdec.water.ca.gov/river/southdeltaStages.html 


These weekly updates are also available for your information on our website:
http://baydeltaoffice.water.ca.gov/sdb/tbp/web_pg/tempbar/weekly.cfm


Users can now subscribe or unsubscribe to the list by clicking the link below:
https://listserv.state.ca.gov/wa.exe?SUBED1=DWR_TBPUPDATE&A=1

Alternatively you can contact me, and I can make additions or removals to the mailing list.


Thank you!
Jacob McQuirk, P.E.
DWR|Bay-Delta Office
Temporary Barriers and Lower San Joaquin
1416 9th St., Room 215-23
Sacramento, CA 95814
office:   916-653-9883
Fax:      916-653-6077
http://baydeltaoffice.water.ca.gov/sdb/tbp/index_tbp.cfm

 


To unsubscribe from the DWR_TBPUPDATE list, click the following link:
https://LISTSERV.STATE.CA.GOV/wa.exe?SUBED1=DWR_TBPUPDATE&A=1