| The Draft State Water Project Delivery Reliability Report 2007 is available for public review. This report updates estimates of the current (2007) and future (2027) State Water Project delivery reliability and incorporates the recent federal court ruling for Delta pumping and potential impacts of future climate change.
The entire report can be accessed by clicking here
(pdf download, 1.64 mb)
A summary of the report can be accessed by clicking here
(pdf download, 78kb)
The suite of CalSim-II studies used in the Draft State Water Project
Delivery Report 2007 can be accessed by clicking here
Katherine Kelly, Chief
Bay-Delta Office
California Department of Water Resources
1416, 9th Street, Room 215-37
Sacramento, CA 95814
e-mail: kkelly@water.ca.gov
Telephone: (916) 653-1099
FAX: (916) 653-6077
|